Page 448

Revista del IEEE 6

448 Journal of the Spanish Institute for Strategic Studies N. 6 / 2015 Parameters and references able to be used in LCC estimates obtained from historical data We have drawn up a table in which the main parameters used by the US and NATO for calculating LCC for a weapon system are summarised. http://revista.ieee.es/index.php/ieee Table III: Parameters and references collated and utilised in LCC calculations.30 31 32 33 30  US, DoD (CAPE). Operating and support cost-estimating guide. Office of the Secretary of Defense. Washington, DC. 2014. Page 2-3. 31  NATO Guidance on Life Cycle Costs. ALCCP1. Op cit.,2008. Page 40. 32  NATO. Independent Cost Estimating and the Role of Life Cycle Cost Analysis in Managing The Defence Enterprise. RTO-SAS-076. RTO Publication. Neuilly-sur-Seine, (Paris). 2012. P. 12. ISBN 978-92-837-0162-0. 33  BARRINGER H. PAUL, DAVID P WEBER. Life Cycle Cost Tutorial. Houston. Op. Cit. 1996.


Revista del IEEE 6
To see the actual publication please follow the link above